Carrier HH660103 Rollout Switch Kit 323613-751 The probe must be installed
Platform notes & fabric story
Description
Carrier HH660103 Rollout Switch Kit 323613 751 The probe must be installed The probe must be installed in the boiler shell or an external manifold at or above the minimum safe water level specified by the boiler manufacturer this kit supports the standard assembly procedures required to reset the valve stroke correctly